Electricity Featured

GenCos release 4,114 MW of power

By Abisola THOMPSON

 Electricity generating companies in Nigeria released an average of 4,114 megawatts of power into the national grid on Monday, a daily energy report has said.

TBI Africa said that the report, which was compiled by the Advisory Power Team, Office of the Vice President, was made available to News Agency of Nigeria (NAN) on Tuesday in Abuja.

It stated that the energy released by the companies was down by 92.47 megawatts from the figure delivered on Sunday.

It, however, indicated that 2,793.58 megawatts could not be generated due to unavailability of gas, adding that unavailability of transmission infrastructure also accounted for non-generation of 176 megawatts during the period.

Similarly, it stated that 168.6 megawatts was not generated due to high frequency resulting from unavailability of distribution infrastructure.

The report revealed that the power sector lost an estimated N1.51 billion on Monday to the factors of insufficient gas supply, distribution infrastructure and transmission infrastructure.

On sector reform and activities, it said that the dominant constraint for Monday’s generation was unavailability of gas.

It said the peak generation attained on the day was 4,766 megawatts. 

 

Related posts

Stakeholders reiterate need for full downstream deregulation

Our Reporter

Sterling Bank Plc appoints new directors

Tonia Osundolire

Shippers council, Customs collaborate on single window platform

Abisola THOMPSON 

17 ships with petroleum products, food items expected — NPA

Meletus EZE

FG orders VCs to reopen varsities, commence lectures

Our Reporter

Berger paints to unveil automated water-based plant in Lagos

Meletus EZE