Electricity Energy FeaturedNASENI targets 7.5MW solar power annually – HarunaEditorJuly 31, 2018 by EditorJuly 31, 20180715 By Giwa SHILE The National Agency for Science and Engineering infrastructure (NASENI) on Monday said it was targeting to generate 7.5 MW solar power annually