Rail Transport

Red line rail project: Lagos Govt. closes Yaba Axis for 3 weeks

The Lagos State Government (LASG) has announced the closure of the Yaba Overpass temporarily from Tuesday to Feb. 23 to commence soil testing for the Red line rail.

The Commissioner for Transportation, Dr Frederic Oladeinde, said in a statement on Tuesday in Lagos, that the closure was in line with the Lagos State Multimodal Master Plan Transport System, with reference to the Red line rail system.

Oladeinde, said the lane closure was necessary to commence soil testing along Yaba, Murtala Mohammed Way and Ojuelegba Area (Tejuosho)

According to him, the exercise is part of the Traffic Management Plan to actualise the Light-Rail Mass Transit Red line phase 1, Oyingbo to Agbado.

The commissioner advised motorists to utilise the main carriageway during the temporary closure.

He gave the assurance that Traffic Management personnel would be on ground to direct traffic to minimise inconveniences.

Oladeinde, however, implored residents, especially motorists that ply these corridors to stay calm and cooperate with the interventions put in place to bring lasting solutions to transportation challenges in the state.

Related posts

Airlines flew 4.1bn passengers in 2017, says IATA

Editor

Truck operators want transit parks, port automation to end Apapa gridlock

Editor

6 die, 24 injured in auto crash on Lagos-Ibadan expressway

By Abisola THOMPSON

FG releases qualification requests for 4 airports concession

Shile GIWA

FAAN officials allegedly beat passenger at NAIA, source denies assault says victim’s asthmatic

Editor

Boeing fires CEO Muilenburg to restore confidence amid 737 crisis

Meletus EZE