Rail Transport

Red line rail project: Lagos Govt. closes Yaba Axis for 3 weeks

The Lagos State Government (LASG) has announced the closure of the Yaba Overpass temporarily from Tuesday to Feb. 23 to commence soil testing for the Red line rail.

The Commissioner for Transportation, Dr Frederic Oladeinde, said in a statement on Tuesday in Lagos, that the closure was in line with the Lagos State Multimodal Master Plan Transport System, with reference to the Red line rail system.

Oladeinde, said the lane closure was necessary to commence soil testing along Yaba, Murtala Mohammed Way and Ojuelegba Area (Tejuosho)

According to him, the exercise is part of the Traffic Management Plan to actualise the Light-Rail Mass Transit Red line phase 1, Oyingbo to Agbado.

The commissioner advised motorists to utilise the main carriageway during the temporary closure.

He gave the assurance that Traffic Management personnel would be on ground to direct traffic to minimise inconveniences.

Oladeinde, however, implored residents, especially motorists that ply these corridors to stay calm and cooperate with the interventions put in place to bring lasting solutions to transportation challenges in the state.

Related posts

NIMASA signs 2026 performance bond, highlights 2025 gains

Editor

Customs intercept live ammunitions, illicit drugs in Enugu

Editor

Illegal parking of impounded trucks persists at Lagos B/Stop

By Meletus EZE

Arik Air resumes flight operations to Owerri, Kano

Our Reporter

Released aviation revenue figures verifiable – NCAA

Editor

‘New civil aviation act to develop sector, strengthen NCAA’

Our Reporter