Electricity Featured

PHED appeals to consumers in Calabar over power outage

By Thompson ABISOLA

The Port Harcourt Electricity Distribution Company (PHED) on Friday appealed to it consumers in Calabar to bear with it over power outage since Sept. 11.

The Manager, Corporate Communications, Mr John Onyi,  said in a statement in Calabar that the outage was due to a fault at the Transmission Company of Nigeria’s (TCN) 150MVA in Calabar.

Onyi said power would soon be restored to the city immediately the technical crew from TCN rectified the fault.

“PHED wishes to inform her numerous customers in Calabar that the current power outage being experienced since Sept. 11 within the metropolis is due to a faulty 150 MVA, 330/132 kilovolt.

“The power transformer belongs to the Transmission Company of Nigeria. However, PHED was reliably notified that the technical crew from TCN has intensified effort to rectify the fault.

“PHED, therefore, solicits for the understanding and patience of her customers while the job last,” he said.

Onyi said PHED regretted inconveniences the outage might have caused.

 

Related posts

 NFF appoints Portuguese Jose Peseiro as Super Eagles coach

Our Reporter

Allocate aviation fuel to airlines airlifting pilgrims – Board

Our Reporter

APC UK appeals to NDDC to stop Nigerian scholarship students’ deportation

Meletus EZE

Two DisCos, one GenCo for listing on Nigeria stock market, says BPE

Editor

DPR to clampdown on illegal LPG sellers in Anambra

Abisola THOMPSON

Saraki is blocking us from probing him, EFCC tells court

Our Reporter