Featured Motoring Transport

Third Mainland Bridge reopened for traffic – LASG

By Thompson ABISOLA

The Lagos State Government has announced that the Third Mainland Bridge which was temporarily closed for Investigative Maintenance Test would be reopened by 5pm on Sunday (yesterday).

The Permanent Secretary, Ministry of Transportation, Dr. Taiwo Salaam said the decision to reopen the bridge earlier than announced followed the completion of the test by engineers.

The government also thanked motorists and residents for their cooperation and patience while the closure lasted.

Lagos in partnership with the Federal Government temporarily shut the bridge midnight 23 August.

It was to be re-opened midnight of Aug.26.

Related posts

Kwande, APC BoT member, attends PDP presidential campaign rally in Jos

Editor

The illusions of a cabal in the mindset of an entrepreneur by Mfei Alol-Nugo

Editor

Niger commences 55km road construction project

Editor

At NBA Conference, Atiku, Obi, Shettima decry State of Nigeria, proffer solutions

Our Reporter

Emirates acclaims the women flying high in aviation

Meletus EZE 

Nigerian Content Fund exceeds $500m, says Wabote 

Our Reporter