Featured Motoring Transport

Lagos-Ibadan Expressway: Traffic diversion on Kara Bridge begins Tuesday

Traffic diversion for construction works to continue on the  600- metre  ‘Kara’ Bridge section on the Lagos outbound of  the Lagos-Ibadan Expressway  will begin on Tuesday.

Mr Kayode Ibrahim, Federal Ministry of Works and Housing engineer supervising the project, said in Lagos on Sunday that the decision was reached after a meeting of  the relevant stakeholders.

“We might need to effect the diversion  on Tuesday morning so as to avoid the Monday morning rush. There is usually heavy traffic on Monday morning, so we feel it is better to make it Tuesday morning.

“All the stakeholders are involved in reaching  this decision. They are : the Federal Roads Safety Corps (FRSC) and the  Lagos State Traffic Management Authority (LASTMA).

Others include :  the Ogun State Traffic Compliance and Enforcement Corps (TRACE), the Police, Julius Berger  Construction Plc., and the Federal Ministry of Works and Housing.

“We have been working together and we are on ground to minimise gridlock. It is nothing special, it is just a normal diversion.

“All the agencies are on ground, all hands are on deck, we have tow trucks, emergency response units. Julius Berger has a 24-hour emergency response unit that responds to all emergencies alongside other agencies.

“FRSC and Julius Berger have their tow trucks deployed, sometimes when we need NEMA and Fire Service we call them and they quickly respond to our calls,’’ he said.

Ibrahim   who appealed for   the cooperation of road users, added that the traffic regulatory agencies also  would be  deploying power bikes to monitor and control breakdowns on the highway.

“LASTMA and FRSC are also deploying power bikes to go round to check traffic issues. We are very prepared, we are only appealing to the road users to be patient.

“Vehicles that are not road worthy should please stay away. People should use good vehicles to avert breakdowns on diversion areas,’’ Ibrahim said

The senior engineer explained that most crashes on the highway were usually at night and the emergency response units had always cleared all impediments before daybreak.

He said that the contractor would be  seizing opportunity of the dry season to speed up construction on various sections of the highway.

Ibrahim added that the same kind of diversion around Mowe, Car Park C and Magboro areas were going to be replicated at  the ‘Kara’ bridge  end with adequate traffic management architecture to avert gridlock.

“If you go to ‘Kara’ bridge  now,  the crash barriers are already lined for the diversion. As soon as we are set, we will just shift the traffic to all the places the barriers had been set.

“We can divert at this moment if we want to because everything is set but we are diverting on Tuesday.

“The whole essence of the diversion at the  various sections is to expedite the completion of the project. Now that  we are in the dry season,  when we can do earth works, we can move faster than during the raining season.

“So, it is better that we open more work areas now that we are in  the dry season so as to be able to complete the job in good time.

“We have always worked on three work areas simultaneously, this diversion is not special at all,’’ he said.

Diversion on the section began with the partial closure of the inbound Lagos portion on the ‘Kara’ Bridge on Sept. 2, 2019 resulting in traffic diversion.

On Dec. 1, 2019, construction on the inbound Lagos was completed but work on the outbound Lagos was suspended due to the Yuletide, hence, the opening of the entire highway to traffic.

 

Related posts

Buhari: We will hand over to winners of free, fair polls in 2023

Our Reporter

High oil prices, broke nation

Our Reporter

LASG trains 400 artisans under its Master Craftsman project

Editor

ExxonMobil Nigeria announces new MD, as McGrath moves to Houston Tx

Editor

Insecurity: Lagos Assembly to transmit protesters’ petition to FG, NASS

Meletus EZE

Beneficiaries of NASENI solar installation training urge agency to sustain programme

Editor