Featured Rail Transport

Lack of funds halts Eastern railway project —FG

The Federal Government on Wednesday said it will not be able to complete the narrow-gauge eastern railway corridor before the President, Major General Muhammadu Buhari (retd.), leaves office in May 2023.

It explained that the project had been stalled by the unavailability of the foreign loans required to fund it.

“Now, the truth of the matter is that if there was a promise to deliver this line before the end of this administration, this promise is no longer feasible because…funding has been a major challenge for this project,” the Minister of Transportation, Mu’azu Sambo, told State House Correspondents at the end of this week’s Federal Executive Council meeting at the Presidential Villa, Abuja.

It would be recalled that in April 2022, the China Civil Engineering Construction Corporation commenced construction of the 2044.1km Port Harcourt-Maiduguri narrow gauge railway project.

The Minister of Transportation at the time, Rotimi Amaechi, who inspected the commencement of work, said the project would stimulate economic activities in the 14 states including five south-eastern states.

Amaechi added that the laying of rail tracks may get to the Enugu State capital by September 2022, projecting that the project would be completed before Buhari leaves office in May 2023.

But while inspecting the progress of work in September, Sambo disclosed that the contractor in charge of the project, China Civil Engineering and Construction Company complained of incessant attacks on its workers around the Abia State axis of the rail corridor.

Related posts

NMDPRA licenses 88 LPG plants, skids in Kaduna State

Our Reporter

Over 540 arrested over online football gambling in China

Editor

FRSC can impound vehicles on all public roads, court rules

Our Reporter

CBN begins registration of more financial institutions on credit management platform

Shile GIWA

NLNG vs NIMASA: Deconstructing the N126 bn feud

By Abisola THOMPSON

FAAN to close domestic runway 18L/36R for repairs

Our Reporter