Motoring Transport

Obalende Bridge linking Dodan Barracks shut, as contractors return to construction sites

The Federal Controller of Works in Lagos, Mr Kayode Popoola, on Thursday said Obalende Bridge linking Dodan Baracks in Lagos had been shut to pave way for rehabilitation.

Popoola said on phone  that the road was seriously  damaged by a petroleum tanker fire.

” We shut it  to advert danger,” he said.

The controller said the bridge deck was badly damaged by the inferno that raged for over five hours, which affected structural integrity of the bridge.

“Obalende Bridge got burnt last week Friday and we have shut it to prevent calamity. It was burnt by a tanker going to supply petroleum product to a filling station around that area, it spilled all its content on the road and caused a huge fire.

“It was a terrible accident and the impact  to the bridge was much, the fire razed for several hours, the concrete was badly damaged.

“We have shut down the bridge to carry out integrity test on it before we can know the extent of damage,’’ he said

He said that ministry officials as well as contractors had resumed work after the COVID-19 lockdown which made some companies suspend construction works.

Popoola said that Julius Berger would resume work on the Lagos-Ibadan Expressway rehabilitation and reconstruction project on Monday while contractors on various sites that suspended operations had resumed work.

He said that Hitech resumed construction works on the Apapa-Oshodi-Ojota-Oworonsoki Expressway after closing down for about three weeks.

“Julius Berger will start work on Lagos-Ibadan Expressway on Monday. The contractors on the Lagos-Badagry Expressway too are getting ready to start work.

“Hitech has returned to site and has been working on the Apapa-Oshodi-Ojota-Oworonsoki Expressway project,’’ he said

The controller said that measures were in place to ensure workmen at various sections on construction sites met COIVD-19 guidlines on social distancing.

“We ensure it does not exceed stipulated number of workers on site to ensure adhering to social distance, ” he said

Popoola said that all contractors had been instructed to provide protective health materials like nose masks and sanitizers for workers while ensuring availability of running water and soap for mandatory hand washing.

 

 

Related posts

Sagamu Interchange Bridge on Lagos-Ibadan Expressway for temporary closure from today, says FRSC

Aliyu DANLADI

Travellers groan as summer fares spike 200%, N1m per economy seat

Our Reporter

Shippers Council, NICON move to avert N670m loss to container deposit

Our Reporter

COVID-19: IATA projects US$23bn revenue loss by airlines in Africa, Middle East

Meletus EZE

Lagos reiterates commitment to Lagos-Badagry Expressway

Abisola THOMPSON

FG to rake in N23bn from Onitsha River Port in 30 years  

Our Reporter