Rail Transport

Red line rail project: Lagos Govt. closes Yaba Axis for 3 weeks

The Lagos State Government (LASG) has announced the closure of the Yaba Overpass temporarily from Tuesday to Feb. 23 to commence soil testing for the Red line rail.

The Commissioner for Transportation, Dr Frederic Oladeinde, said in a statement on Tuesday in Lagos, that the closure was in line with the Lagos State Multimodal Master Plan Transport System, with reference to the Red line rail system.

Oladeinde, said the lane closure was necessary to commence soil testing along Yaba, Murtala Mohammed Way and Ojuelegba Area (Tejuosho)

According to him, the exercise is part of the Traffic Management Plan to actualise the Light-Rail Mass Transit Red line phase 1, Oyingbo to Agbado.

The commissioner advised motorists to utilise the main carriageway during the temporary closure.

He gave the assurance that Traffic Management personnel would be on ground to direct traffic to minimise inconveniences.

Oladeinde, however, implored residents, especially motorists that ply these corridors to stay calm and cooperate with the interventions put in place to bring lasting solutions to transportation challenges in the state.

Related posts

MMIA incident : Our airplanes are airworthy, says Air Peace

By Shile GIWA

No plan to reduce duty on imported vehicles – Customs

Our Reporter

Lagos-Ibadan Expressway diversion: FRSC deploys 100 officers

Shie  GIWA

FG impounds British aircraft in Lagos, begins investigation

Our Reporter

United Nigeria Airlines increases Lagos, Abuja flights

Meletus EZE

FG defends multiple entry points granted to foreign airlines 

Our Reporter