Featured Gas Oil

SNEPCo’s Bonga FPSO completes 2022 turnaround maintenance 

Shell Nigeria Exploration and Production Company Limited (SNEPCo) is pleased to announce that the 2022 Turnaround Maintenance (TAM) of the Bonga floating production storage and offloading vessel (FPSO)  has been completed.

 

The 225kbopd capacity FPSO was shut down on October 18, 2022 to carry out statutory inspections, recertifications and other critical asset integrity restoration activities.

 

The 2022 TAM which was originally planned for 30 days was completed in 22 days on November 9, 2022 thanks to excellent front-end planning and flawless execution. 

 

Commissioning and start-up activities are in progress and will culminate in ramp up of oil and gas production in the coming days

Related posts

Nigeria banks remain stable, says NDIC

Meletus EZE

Ooni pays tributes to Oyawoye, Africa’s first professor of geology

Editor

Lagos motorists groan over multiple levies

Editor

Crude Oil Theft: Niger Delta Lost $1.35bn in 2019 First Quarter – Obaseki

By Abisola THOMPSON 

Recover looted wealth to fund budget: Falana

By Meletus EZE

A’Ibom generates N6.85bn IGR

Editor