Featured Motoring Transport

LASG to shutdown Third Mainland bridge from Friday midnight

The Lagos State Government has announced that there would be total closure of the third mainland bridge from midnight Friday to midnight Saturday.

The Commissioner for Transportation, Dr Frederic Oladeinde who made this known in a statement issued in Lagos on Wednesday, said   the bridge would be closed for 24 hours.

Oladeinde said  the closure would enable  contractors move the equipment used during the rehabilitation process of the bridge completely to allow both the Oworonshoki and Adeniji bound lanes open fully to traffic.

He said the closure was necessary,  haven  completed the replacement of the 12 expansion joints and to demobilise the superstructure of the bridge.

The commissioner, therefore, advised motorists from Ogudu, Alapere and Gbagada to use Ikorodu Road, Jibowu and Yaba as alternative routes.

“While Iyana Oworoshoki-bound traffic from Lagos-Island, Iddo, Oyingbo, Adekunle and Yaba are enjoined to use Herbert Macaulay Way, Jibowu and Ikorodu road as alternative routes,” he said.

Oladeinde assured that Traffic Management Personnel would be deployed along the affected routes to minimise and address any traffic impediments during the closure.

He commended the people of Lagos for their cooperation during the prolonged repair works of the bridge, assuring that it was now safe for use by all and sundry.

Related posts

Annual capital flight in telecoms now $2.16bn – FG

Our Reporter

Off-grid development as panacea to Nigeria’s power challenges

Our Reporter

Trading maintains positive mood on NSE, up by 0.37%

Editor

NIPS: Minister assures recommendation will be implemented

Meletus EZE

OPEC Slashes Q2 Oil Demand Estimate by 690,000 bpd

Our Reporter

Nigeria’s gas programme to create 2m jobs annually – Minister

Abisola  THOMPSON